2007.08.07 – Work

August 9, 2006 on 4:59 pm | In Work | No Comments

Embrey building

  • Connect cables from patch panel to switch

Caruth building

  • Checking wireless connection on 2nd floor — uplink is down due to broken optical cable

No Comments yet »

RSS feed for comments on this post. TrackBack URI

Leave a comment

You must be logged in to post a comment.

Powered by WordPress with Pool theme design by Borja Fernandez.
Entries and comments feeds. Valid XHTML and CSS. ^Top^

Register Login