2007.08.07 – Work
August 9, 2006 on 4:59 pm | In Work | No CommentsEmbrey building
- Connect cables from patch panel to switch
Caruth building
- Checking wireless connection on 2nd floor — uplink is down due to broken optical cable
No Comments yet »
RSS feed for comments on this post. TrackBack URI
Leave a comment
You must be logged in to post a comment.
Powered by WordPress with Pool theme design by Borja Fernandez.
Entries and comments feeds.
Valid XHTML and CSS. ^Top^