2006.07.24-2007.08.04 – Work
August 9, 2006 on 4:56 pm | In Work | No CommentsEmbrey building
- Assemble Switches
- Install UPS and Switches into the racks in the closets on basement/1st floor/3rd floor
- Connect cables from patch panels to switches
- Connect cables in the faculty rooms and labs
- etc…
No Comments yet »
RSS feed for comments on this post. TrackBack URI
Leave a comment
You must be logged in to post a comment.
Powered by WordPress with Pool theme design by Borja Fernandez.
Entries and comments feeds.
Valid XHTML and CSS. ^Top^