2006.07.24-2007.08.04 – Work

August 9, 2006 on 4:56 pm | In Work | No Comments

Embrey building

  • Assemble Switches
  • Install UPS and Switches into the racks in the closets on basement/1st floor/3rd floor
  • Connect cables from patch panels to switches
  • Connect cables in the faculty rooms and labs
  • etc…