2006.08.09 – Work

August 9, 2006 on 5:02 pm | In Work | No Comments

Embrey building

  • Connect cables from the patch panel to switch for 3rd floor lab

Caruth building

  • Change the broken optical fiber from main router to switch

Mechanical Transition building

  • Recover old equipments due to the building is being abandoned

2007.08.07 – Work

August 9, 2006 on 4:59 pm | In Work | No Comments

Embrey building

  • Connect cables from patch panel to switch

Caruth building

  • Checking wireless connection on 2nd floor — uplink is down due to broken optical cable

2006.07.11-14 – Watched List

August 9, 2006 on 4:57 pm | In Watched list | No Comments

Anime

  • [DB]_Naruto_191_[E7923CB9].avi
  • [DB]_Naruto_192_[B41EC78F].avi
  • [yesy]_Utawarerumono_-_13_[1D50A5E6].avi
  • Honey & Clover II – 02 [Solar-IDE][4BF16E20].avi

2006.07.24-2007.08.04 – Work

August 9, 2006 on 4:56 pm | In Work | No Comments

Embrey building

  • Assemble Switches
  • Install UPS and Switches into the racks in the closets on basement/1st floor/3rd floor
  • Connect cables from patch panels to switches
  • Connect cables in the faculty rooms and labs
  • etc…