2006.08.09 – Work
August 9, 2006 on 5:02 pm | In Work | No CommentsEmbrey building
- Connect cables from the patch panel to switch for 3rd floor lab
Caruth building
- Change the broken optical fiber from main router to switch
Mechanical Transition building
- Recover old equipments due to the building is being abandoned
2007.08.07 – Work
August 9, 2006 on 4:59 pm | In Work | No CommentsEmbrey building
- Connect cables from patch panel to switch
Caruth building
- Checking wireless connection on 2nd floor — uplink is down due to broken optical cable
2006.07.11-14 – Watched List
August 9, 2006 on 4:57 pm | In Watched list | No CommentsAnime
- [DB]_Naruto_191_[E7923CB9].avi
- [DB]_Naruto_192_[B41EC78F].avi
- [yesy]_Utawarerumono_-_13_[1D50A5E6].avi
- Honey & Clover II – 02 [Solar-IDE][4BF16E20].avi
2006.07.24-2007.08.04 – Work
August 9, 2006 on 4:56 pm | In Work | No CommentsEmbrey building
- Assemble Switches
- Install UPS and Switches into the racks in the closets on basement/1st floor/3rd floor
- Connect cables from patch panels to switches
- Connect cables in the faculty rooms and labs
- etc…
Powered by WordPress with Pool theme design by Borja Fernandez.
Entries and comments feeds.
Valid XHTML and CSS. ^Top^